Sunday, 16 December 2012

PROJECT 7 : INTERLINKED




My first experience working in a group for this studio 100 started with this project.

Interlinked
Interlinked

This project is divided into three sub-project :

Project 7a : Analysis of HBP spaces
Project 7b : Skyway /Pedestrian Bridge
Project 7c : Skyway structural model


Project 7a : Analysis of HBP spaces
For this project,we have to analyse all the existing building in the HBP school area.
We also need to study the sun orientation,prevailing wind,vegetation,pedestrian 
and vehicular circulation around that area.



Our analysis


Site plan








Project 7b : Skyway

After done the site analysis,our group had decided to build our skyway between Lecture Hall E48 and Studio Building.
We have to propose a unique skyway design to make it as a landmark of HBP school.
So,we have to prepare a presentation drawing complete with side,rear,plan and front elevation of the skyway.


Our Inspiration : Digital












The drawing



Floor Plan



Front Elevation

Back Elevation



Side Elevation